Solution · Operational Continuity Management

Know Whether Production Is Still Protected.

OpsDeck connects available raw-material inventory, expected consumption and inbound movement to show how long operations remain protected, where continuity is weakening and what management needs to address first.

Works with existing data Configurable operating thresholds No ERP replacement

Illustrative interface

Material continuity overview

06 Jun 2026

Critical materials

24

Protected

18

Watchlist

4

At risk

2

MaterialPlant / unitAvailableDaily useCurrent coverConfirmed inboundProjected coverMin thresholdRisk dateStatus
Coking coalBlast Furnace 118,400 t1,120 t/day16.4 days8,000 t23.5 days12 days18 JunProtected
LimestoneSinter Plant4,220 t410 t/day10.3 days10.3 days14 days12 JunAt risk
Ferro manganeseSteel Melt Shop680 t42 t/day16.2 days240 t21.9 days10 days20 JunProtected

Selected material

Limestone · Sinter Plant

Usable inventory4,220 tCurrent cover10.3 daysMinimum required14 daysAssigned ownerMaterials team
Projected coverRisk point · 12 Jun
Minimum threshold
Today20 Jun

The management question

Stock on hand does not tell management whether production is protected.

A material may appear available today but still create a future production risk when consumption, inbound timing, shipment confidence and minimum operating requirements are considered together.

Available stock
Expected consumption
Inbound movement
Operating threshold
Continuity status
How many operating days does each critical material cover?
Which material reaches its minimum threshold first?
Will confirmed inbound arrive before the risk date?
Who is responsible for the next action?

Built around critical materials

Monitor the materials that can constrain production.

Each implementation is configured around the plant’s own materials, units, operating thresholds and consumption logic. Illustrative examples include:

Coal and cokeIron ore and pelletsLimestone and dolomiteFerro alloysRefractoriesFuel and critical consumables

Insufficient material cover

Current usable inventory may fall below the plant’s minimum operating requirement.

Inbound timing exposure

Expected material may not arrive before available cover is exhausted.

Shipment confidence

Delayed, incomplete or uncertain movement can reduce projected cover reliability.

Supplier context

Recurring delays or quantity shortfalls add context to operational exposure.

From data to decision

A clear continuity view built from operating reality.

01

Read available inventory

Use the latest approved stock position for each critical material.

02

Apply expected consumption

Use the plant’s configured consumption rate or operating plan.

03

Calculate current cover

Estimate how many operating days available material can support.

04

Add qualified inbound movement

Consider quantity, arrival date and shipment status.

05

Compare against thresholds

Evaluate projected cover against the configured minimum requirement.

06

Surface the risk

Show the likely date, reason, affected material and required action.

OpsDeck’s continuity status is based on customer-provided data and configurable operating assumptions. It supports management review and does not replace plant operating judgment.

The operational view

See the earliest continuity risks before they become production problems.

Illustrative interface

Material continuity overview

06 Jun 2026

Critical materials

24

Protected

18

Watchlist

4

At risk

2

MaterialPlant / unitAvailableDaily useCurrent coverConfirmed inboundProjected coverMin thresholdRisk dateStatus
Coking coalBlast Furnace 118,400 t1,120 t/day16.4 days8,000 t23.5 days12 days18 JunProtected
LimestoneSinter Plant4,220 t410 t/day10.3 days10.3 days14 days12 JunAt risk
Ferro manganeseSteel Melt Shop680 t42 t/day16.2 days240 t21.9 days10 days20 JunProtected

Selected material

Limestone · Sinter Plant

Usable inventory4,220 tCurrent cover10.3 daysMinimum required14 daysAssigned ownerMaterials team
Projected coverRisk point · 12 Jun
Minimum threshold
Today20 Jun

From risk to ownership

Turn every important risk into a tracked management action.

Risk identified
Owner assigned
Action recorded
Due date monitored
Evidence added
Closed

Identifying a risk is only useful when responsibility, next steps and closure remain visible. This management follow-up layer does not replace procurement approval workflows.

Works with the current process

Adds continuity intelligence without replacing operating systems.

What stays the sameWhat OpsDeck adds
Existing ERP or inventory recordsStructured material-cover view
Existing purchase-order processInbound dependency visibility
Existing supplier communicationSupplier and shipment context
Existing procurement responsibilityPrioritised risks and assigned actions
Existing source files and exportsConsolidated management visibility

No forced ERP migration. No mandatory DCS access. No change to procurement authority.

Start with a defined scope

Begin with one plant and its critical materials.

1

Define critical materials

Agree which materials should be monitored and what operations they support.

2

Map available data

Review stock, consumption, purchase-order, shipment and supplier information already maintained.

3

Configure continuity logic

Set material-specific consumption assumptions, lead times and minimum operating thresholds.

4

Validate historically

Compare calculated cover and risk signals against earlier periods and known events.

5

Begin management review

Introduce the view, assign owners and refine thresholds using plant feedback.

Existing approved files and exports can be sufficient to begin. Deeper integrations can be considered after the continuity logic is validated.

Additional context

Understand when supplier performance affects continuity.

Supplier performance becomes operationally relevant when late delivery, short supply or inconsistent movement changes the plant’s material-cover position.

Explore Supplier Risk Visibility
Delivery timeliness
Quantity fulfilment
Recurring delay patterns
Open purchase-order exposure
Dependence on individual suppliers
Historical reliability

Controlled data onboarding

Designed to work alongside existing systems.

Tenant-isolated data
Role-based access
Secure sessions
Server-side validation
Audit-ready activity history
Configurable file or data-feed onboarding

OpsDeck can begin with customer-approved exports from existing systems. Direct access to ERP, DCS, MES or production-control systems is not required for the initial continuity assessment.

Discuss your continuity requirement

Discuss the materials that determine your plant’s continuity.

Show us how critical-material stock, consumption and inbound movement are currently tracked. We will explain how OpsDeck can convert that information into a structured continuity view.

Discuss Your Continuity Requirement